Snagging is a detailed inspection of a newly built property before handover. The goal is to find defects — "snags" — so the developer fixes them before you accept the keys.
What is checked
- Walls, ceilings and paint: cracks, uneven finishes, stains
- Floors and tiles: hollow or chipped tiles, gaps, levels
- Doors, windows and wardrobes: alignment, locks, seals
- Kitchen and bathrooms: leaks, water pressure, drainage, silicone
- Electrics and air conditioning: sockets, lights, AC cooling and noise
- Balconies, glass and fittings
How it works
- The developer invites you to the handover inspection.
- The unit is inspected and every defect is photographed and listed.
- The developer receives the snag list and fixes the items.
- A re-inspection confirms the work before you sign the handover.
Why it matters
After handover it is harder and slower to get defects fixed. A proper snag list protects your property, your rental income and the resale value. I organise snagging for my clients — also when they are abroad.